- R-19* band insulation
- R-38* ceiling insulation (vaulted ceilings R-30)
- R-19 Framed basement walls
- R-15* Sidewall insulation in 2×4 stud
- R-19 Basement ceiling insulation
- 1/2″ Drywall, glued and hung with screws & nails
- Walls painted 1 coat primer & 1 finish coat flat
- *Insulation done to most current code
Additional Articles
What does “perc approved” really mean for a building lot?
One of the most crucial factors when considering purchasing a lot is whether it’s approved for an on-site septic system. If not, bottom line, the lot is unbuildable, and you’ve purchased what we refer to as a “glorified strawberry patch”. But today, it goes far beyond just being perc approved or not.